Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Trusted Home Additions & ADU for Las Vegas Homeowners
Home additions and ADU construction in Las Vegas typically run $45,000 – $130,000 for an addition and $90,000 – $220,000 for a detached ADU, depending on size, site work, and how much of the interior you finish. If you’re in Summerlin, Spring Valley, or out past Sunrise Manor and you’ve watched a national builder hand you one number on the phone and another at the door, we work the other way around: every scope, every allowance, and every change order comes to you in writing before the work moves. Our crews have up to 28 years of experience, and they’ve set foundations, framed second stories, and finished garages into living space across the Las Vegas Valley. Call (866) 814-4155 and a live person will pick up, day or night.
What Our Home Additions & ADU Service Includes
Every job starts with what you actually want the space to do. A mother-in-law suite is not a home office is not a rental unit, and the design has to match the purpose before anyone pulls a permit.
ADU Design & Permitting
An accessory dwelling unit, or ADU, is a self-contained home on your lot with its own kitchen, bathroom, and entrance. Design and permitting is the front end of that: floor plans, utility tie-ins, and the Clark County or city paperwork that makes the unit legal. We coordinate the drawings and pull the permits ourselves, and the permit inspector works for you, not for us – that’s why we like him. Skipping permits on an ADU is the fastest way to end up with a structure a future buyer can’t finance, so we don’t skip them.

Garage Conversion ADU
Converting an existing garage into a rental or a family suite is the least expensive path to an ADU, generally $30,000 – $80,000. It works best when your garage sits on a slab that’s already graded right and you aren’t giving up the only covered parking you have. We handle the framing, insulation, plumbing rough-in, electrical, and the finish work, and we keep the conversion on the same footprint so the exterior of your house still looks like the house your neighbors know.

New Detached ADU
A new detached ADU is a freestanding, fully separate home in the backyard, and it’s the most expensive option, usually $90,000 – $220,000. You need it when privacy matters – a long-term tenant, an aging parent, or adult kids who need their own front door. We handle site work, foundation, framing, utilities, roofing, and finishing as one job, with a written scope that tells you up front what’s a standard allowance and what’s an upgrade.

Junior ADU & Interior Conversion
A junior ADU is a smaller unit built inside the existing house, often carved out of a spare bedroom, a den, or an oversized laundry room. It’s the right call when you want the space but the lot or the budget won’t carry a full detached build. We work the plumbing and electrical carefully, because moving a bathroom wall is cheap until someone puts a drain in the wrong spot – that’s a conversation we have before the concrete, not after.
ADU Site Prep & Utilities
Site prep is everything below and around the unit: grading, drainage, and running water, sewer, gas, and power out to the new structure. In Las Vegas this step gets underestimated constantly, because caliche and hardpan don’t dig like dirt, and a slab poured on bad drainage will find a way to tell you about it. We scope the utility runs and the drainage as line items, so nobody is guessing in month three about who pays for the trench.
Room Additions
A room addition is anything from a bedroom bump-out to a full family room, and it’s the most common request we get, running $45,000 – $130,000. You need it when the family has outgrown the square footage but the schools, the street, and the neighbors are worth staying for. We match rooflines, siding, and stucco so the addition reads as part of the original house, and we use James Hardie siding on the new walls to match what’s already there. Second story additions and enclosed patios or sunrooms get handled the same way, with the structural and permit work scoped in writing from day one.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Brands We Service for Home Additions & ADU
When we build an addition or ADU, the finish materials are named in the contract so you can look them up. James Hardie siding is our first choice for exterior walls on additions, because fiber cement holds up to Las Vegas sun and wind far better than the old stucco-and-foam patch jobs, and we install it to the manufacturer’s spec so the warranty stands. We’re comfortable with the full lineup and know exactly where installer shortcuts tend to show up years later.
On the inside, KraftMaid and Wellborn cabinetry are what we spec for ADU kitchens, because both lines hold up to daily tenant use and the box construction is honest. For countertops, Cambria quartz is a frequent pick, and we know how thin a slab can go before it starts to look wrong on a small kitchen island. Whether you have a brand preference of your own or you’d rather we walk you through the options, we can help.
Signs You Need Home Additions & ADU Right Now
- You’re turning the dining room into a bedroom. When a table nobody eats at has become the fifth bedroom, you don’t have a furniture problem, you have a square footage problem. A room addition solves it without squeezing anyone into a hallway.
- An aging parent needs to move in. Sharing a bathroom and a kitchen works for a week, not for five years. A junior ADU or garage conversion gives both households a real door to close.
- Your garage is full of everything except a car. If the two-car garage has become a storage unit with a door, converting it to livable space is often cheaper than adding on. It’s money that’s already sitting on your lot.
- You want rental income but a driveway is too much. In Las Vegas, where tourism and healthcare keep long-term renters moving, a properly permitted ADU can carry real income. It only works if the permits are pulled, which rules out a lot of the cheap bids.
- Your last contractor told you permits were optional. That’s the phone call we hear most often, and it’s the one that lands people in trouble at resale. If the previous work on your house was never inspected, adding on is the moment to get it right.
Our Home Additions & ADU Process – Step by Step
- 1
Site visit and a real conversation. We walk the lot, look at the grading, check where the utilities come in, and listen to how you actually want to use the space. No number gets quoted from a phone call, because a phone call doesn’t know your soil or your setbacks.
- 2
Written scope, written allowances. You get a line-item estimate with every allowance spelled out – the allowance that isn’t on paper is a surprise waiting for a date. You’ll also get your free second opinion on any written estimate you bring us from someone else.
- 3
Permits and inspections. We pull the permits and schedule the inspections on every eligible job. The inspector signing off on your framing and your final is a document that protects your resale value, and we don’t treat it as a nuisance.
- 4
Construction with the same crew from start to finish. Tom Barrett and his sons are on-site most days, and the crew members are background-checked and carry the Barrett & Sons name. If a scope change comes up mid-build – and on an ADU it often does – you get a written change order before a nail moves, not an invoice at the end.
- 5
Final walkthrough and the 90-Day Done Right Promise. We walk the finished space with you, punch-list it, and hand it over. Then the written 90-Day Done Right Promise covers every construction and remodeling job: if it’s not right, one call brings Tom back to make it right.
See the difference
Before
After
Before
After
Before
AfterHow Much Does Home Additions & ADU Cost in Las Vegas?
A typical garage conversion ADU in Las Vegas runs $30,000 – $80,000, a room addition runs $45,000 – $130,000, and a new detached ADU runs $90,000 – $220,000 depending on size and finishes. A junior ADU carved out of a spare room is usually the least expensive route of all, because it uses walls and plumbing you already have.
What moves the number: the footprint, whether a slab or foundation has to be poured, how far the utilities have to travel, caliche and grading conditions on your lot, and how much of the kitchen and bath you finish. Upgraded cabinets and countertops push it up, and a bare-bones layout pulls it down. To avoid overpaying, get the scope in writing line by line – not a lump sum you can’t itemize.
Every free estimate we give is itemized, with standard grades and upgrade prices listed separately, plus your permit allowance. You’ll also hear about our standing offers: $40 off any repair over $200, a free second opinion on any written estimate, and no trip charge inside the county. Nevada is a big state – our technicians are experienced across all of it, and you’ll know where every dollar is going before you sign. Call (866) 814-4155 to schedule yours.
Home Additions & ADU Near Las Vegas – Our Service Area
We build additions and ADUs all over the Las Vegas Valley: Summerlin and Spring Valley on the west side, Winchester and Paradise near the Strip corridor, Whitney and Sunrise Manor on the east, and Enterprise in the south. We also work Henderson, Boulder City, North Las Vegas, and out through Sandy Valley. Most of the valley is a short drive, and we schedule site visits within the week. If your lot is in Spring Valley, you’re close to a crew that’s already done this neighborhood’s soil and setbacks many times over.
Serving Las Vegas, NV – Our Local Coverage Area
We serve Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions – Home Additions & ADU in Las Vegas
An ADU is a separate, self-contained living unit on the same lot as your house, with its own kitchen, bathroom, and entrance. A home addition is new square footage attached to the main house, like a bedroom or family room. Both add value and both need permits, but an ADU can legally be rented while a room addition usually cannot.
A garage conversion is typically the fastest, often 3 to 5 months, a room addition usually runs 4 to 7 months, and a new detached ADU can take 6 to 10 months or more with permitting and inspections. The design and permit phase at the front is where the schedule is won or lost, so we start there. If you’re comparing timelines, ask each contractor when the clock starts, because a builder who starts the count at signing is telling you a different story than one who starts at framing.
Garage conversions run $30,000 – $80,000, room additions run $45,000 – $130,000, and new detached ADUs run $90,000 – $220,000 depending on finishes and site work. Las Vegas sun, wind, and caliche all play a role, so the site matters as much as the square footage. Call (866) 814-4155 for an exact quote – estimates are free and itemized.
Yes. We install and stand behind James Hardie siding on new exterior walls, and KraftMaid and Wellborn cabinetry are what we spec for the kitchens in our ADUs. You’ll see the brand names written into the contract, so you can look them up rather than take anyone’s word for it.
No – additions are planned construction, not emergency work, and we won’t pretend otherwise. Nobody builds a detached ADU same-day, and a contractor who tells you they can is telling you something else, too. We will tell you plainly what our schedule looks like and when the permit window opens.
Every completed addition and ADU gets the written 90-Day Done Right Promise, on the contract, not in the fine print. If something isn’t right, one call brings Tom back to fix it. Our background-checked crew members carry the Barrett & Sons name on the work, and Tom’s license number is published – look it up before you sign anything.
Clear the driveway and yard access, secure pets, and plan where you’ll store the things currently in the garage if it’s being converted. Confirm your setbacks and any HOA rules yourself, because no contractor can override your HOA. Then ask for the written scope and change-order policy so you know how every step gets communicated.
Schedule Your Home Additions & ADU Service in Las Vegas Today
If you’re ready to add real square footage in Las Vegas, call (866) 814-4155 and a live person will answer, day or night. You’ll get a written, itemized estimate, permits pulled and inspections signed, and the 90-Day Done Right Promise on every job. It costs nothing to ask, and nothing to start.
Written by the team at Barrett & Sons Construction.