Kitchen remodeling
Bathroom remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterWhat a Small Kitchen Remodel Costs in Las Vegas, NV (And Why the Cheapest Bid Often Costs More)
A small kitchen remodel in Las Vegas typically runs $9,000 to $20,000, with most tract-home galley and L-shaped kitchens landing around $14,000 to $18,000 once cabinets, counters, backsplash, and permits are counted. A full kitchen remodel here can reach $14,000 to $45,000 depending on layout changes. For an exact number on your kitchen, call Barrett & Sons Construction Las Vegas at (866) 814-4155: estimates are free, pricing is upfront, and a live person answers the phone. Licensed, insured, and backed by our written 90-Day Done Right Promise.
Why a $12,000 Las Vegas Kitchen Looks Like a $20,000 Kitchen Four Years Later
The desert doesn’t care what you paid. It just cures what isn’t rated for it.
Build a small kitchen with builder-grade cabinets and laminate countertops for $12,000, and there’s a good chance you’re looking at a redo inside four years. Las Vegas summers push past 105°F, and the swing between a cooled interior and a sun-blasted exterior wall is brutal. West- and south-facing kitchens take the worst of it, and that’s most of the tract housing across Summerlin and Centennial Hills, where stucco-and-tile subdivisions from the 1990s and 2000s put a lot of glass on the hot side of the house.
What happens to cheap materials in that environment:
- Particleboard cabinet boxes swell and delaminate near exterior walls. Plywood-box construction holds up far better, which is one reason we spec KraftMaid cabinets in Las Vegas kitchens.
- Laminate countertops lift at the seams as the substrate expands and contracts. A quartz surface like Cambria doesn’t care about the thermal cycling.
- Caulk joints open up between backsplash and counter within a couple of seasons, and once water gets behind them, the repair gets bigger.
Run the cost-per-year math and the “cheap” bid isn’t cheap. A $12,000 kitchen that needs redoing in four years costs $3,000 a year. A $18,000 kitchen built with materials rated for the Mojave that lasts twenty years costs $900 a year. That’s the whole argument for mid-grade materials in one paragraph, and it’s why we’d rather show you a KraftMaid or Cambria spec sheet than hand you a price on a napkin.
What a Real Small Kitchen Remodel Cost Breakdown Includes in Las Vegas
Cost guides that skip the desert-specific line items are the ones that produce sticker shock at contract signing. Here’s what actually lands on a Las Vegas tract-home kitchen scope.
| Line Item | Cost Range |
|---|---|
| Cabinet installation (KraftMaid or comparable) | $4,000-$13,000 |
| Countertop template, fabrication & install (Cambria quartz) | $2,000-$6,500 |
| Backsplash installation | $800-$2,500 |
| Kitchen island installation (if layout allows) | $3,000-$10,000 |
| Full small kitchen remodel, all-in | $9,000-$20,000 |
| Full kitchen remodel with layout changes | $14,000-$45,000 |
Three lines most guides leave out of the small kitchen remodel cost:
- Cabinet removal and disposal. Block walls and slab-on-grade construction make tearout heavier than the drywall-and-wood-frame demo you’d see in other markets. This is real labor, and it shows up in the bid.
- Countertop template and fabrication lead time. Quartz isn’t cut on site. There’s a template visit, a fabrication window, and an install day, and that schedule drives the whole job.
- Permit filing if electrical or plumbing moves. Relocate a circuit for a new range hood or move the sink, and Clark County wants to see it. We pull permits and get inspections signed on every eligible job, because the last contractor most of our customers used told them permits were optional.
For a full walkthrough of what our kitchen work covers, see Kitchen Remodeling, or read more about Kitchen Remodeling in Las Vegas.
What to Look For in a Las Vegas Kitchen Bid (Comparison Checklist)
When you’re comparing bids on a small kitchen remodel, cost is only half the story. The other half is what’s actually written down.
- Named brands with lookup-able warranties. KraftMaid and Cambria are brands you can research, compare, and check a warranty on. Unbranded cabinets arriving on a van with no manufacturer backing are a gamble, and in a desert that cures everything, that gamble pays out badly.
- Written allowances. The cabinet allowance, the countertop allowance, and the backsplash allowance should be defined numbers on paper before work starts, not verbal ranges that grow when you upgrade mid-job. An allowance that isn’t on paper is a surprise waiting for a date.
- Written change orders. Any scope change gets priced and signed before a nail moves. No surprise invoices at the end.
- Permits and inspections. The permit inspector works for you, not for us, and that’s why we like him.
- A guarantee with a phone call behind it. Our 90-Day Done Right Promise is written on every contract. If a cabinet hinge fails, a drawer box binds, or a Cambria seam shifts before 90 days, one call brings the crew back.
- Technicians with real time in the trade. Our technicians have up to 28 years of experience, and they carry the Barrett & Sons name on every visit.
Barrett & Sons Construction Las Vegas is owner-operated, founded in 1998 and still run by the same family. We’ve proudly served local communities for over 29 years, and we’re the ones who publish our license number so you can look it up before you sign anything.
Frequently Asked Questions
A small kitchen remodel in Las Vegas typically costs $9,000 to $20,000, with most galley and compact L-shaped kitchens in tract homes landing between $14,000 and $18,000. That range covers cabinet removal, new cabinets, countertops, backsplash, and permit filing if plumbing or electrical moves. Call (866) 814-4155 for an exact quote on your kitchen; estimates are free.
Refacing is usually cheaper upfront, but in Las Vegas the math shifts toward replacement faster than it does elsewhere. Extreme UV and the daily swing between cooled interiors and hot exterior walls age cabinet finishes and stress particleboard boxes quickly, especially in west- and south-facing kitchens. If the existing boxes are swollen or delaminating, refacing a failing box just covers the problem. New KraftMaid plywood-box cabinets cost $4,000 to $13,000 installed and are rated to hold up. Call us and we’ll tell you honestly which path makes sense for your kitchen.
We can usually get a written estimate out within a few days and schedule your start date once the materials and permit are lined up. Cabinet lead times and Clark County permit turnaround drive the actual start date more than anything else, and we’ll tell you both in writing before you commit. Call (866) 814-4155 and we’ll give you a realistic timeline, not a promise we can’t keep.
Yes. Any kitchen job that relocates electrical or plumbing gets a permit pulled and an inspection signed before we close out the job. It’s a small line item that protects your resale and your safety, and it’s not optional on our contracts. If your last contractor told you permits were skipped, call us at (866) 814-4155 and we’ll sort out what needs to be filed.
Get a Free Estimate on Your Small Kitchen Remodel
If you’re comparing kitchen bids in Las Vegas and want a straight answer on what a small kitchen remodel costs for your house, call (866) 814-4155. We’ll come out, walk the kitchen with you, and leave you with a written estimate that names every allowance and every brand. Free second opinion on any written estimate you already have. No trip charge inside the county. Ask about our $40 off any repair over $200 and the permanent 10% senior and veteran discount.
Written by the team at Barrett & Sons Construction Las Vegas, serving Las Vegas, NV.
What Our Customers Say
"Came back a year later to sort a door that had dropped as the frame settled. No charge and no argument about whether it was covered."
- Thaddeus Oyelowo"Tom Barrett was on our job most days himself, not just at the quote and then never again. When something needed deciding there was an actual person to decide it with."
- Rosalie Pemberton"Addition over the garage matched the original roofline and brickwork so closely that visitors do not realise it was added. He tracked down the closest brick he could find rather than settling."
- Gideon Stroud