Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Delta Home Additions & ADU: The Las Vegas Owner’s Guide
We build and finish Delta-spec home additions and ADUs in Las Vegas, and the installed range runs $45,000 – $130,000 for an addition and $90,000 – $220,000 for a detached or attached ADU. Barrett & Sons Construction is an independent contractor; we’re not affiliated with Delta, so we match your drawings, plan set, and Delta product line to what actually gets built and inspected here. Most owners don’t “discover a part failed” on an addition – they discover the first contractor vanished mid-shell, left an unpermitted framed box in the side yard, or handed a final invoice that didn’t match the phone quote. That’s the failure we see most in Las Vegas, and it’s the one we fix before the drywall goes up.
Which Delta Models This Applies To
Delta’s home addition and ADU lines are modular component systems – wall panels, roof trusses, floor cassettes, and connection hardware sized by series and load rating, not by a single universal part number. The part you need is specced on the plan set and the framing schedule, not on a sticker you can read off the panel. So match on three things: the Delta model or series code on the panel tag, the span and load rating in the engineering packet, and the panel dimensions in inches, not “about four feet.” A panel that’s two inches off won’t pass a Clark County inspection no matter how good the fit looks from the yard.
On OEM vs. aftermarket: for structural connectors, hold-downs, and rated fasteners, we use OEM or listed equivalents that carry an ICC evaluation report – an off-brand bracket with no testing paperwork is exactly what an inspector flags. For finish trim, siding, and interior components, a quality aftermarket match is fine and often matches the existing Delta panel better than a discontinued OEM run. KraftMaid, Cambria, and Silestone show up in our addition and ADU interiors alongside Delta structural components, and we spec each to the plan.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Delta Home Additions & ADU Is Failing
- Cracks along the panel seams. Usually a footing or slab issue, or connectors undersized for the span – in Las Vegas the soil moves, and a thin slab will telegraph every crack upward through the seams within a season.
- Sticking doors and windows in the new room. That’s settling or a truss that wasn’t seated to the load rating. It shows up faster here than in wetter climates because the summer heat and dry swing stress the frame joints daily.
- Roof leaks at the tie-in to the existing house. The most common Delta addition failure in Las Vegas: the flashing at the junction was done as an afterthought, and the first monsoon finds it. A proper tie-in is built into the plan, not caulked on after.
- Water pooling at the slab edge after rain. Grade and drainage weren’t set in the site plan. Our desert storms drop more in an hour than a week of drizzle elsewhere, and a flat pad holds it.
- An unpermitted shell or an unfinished interior. The tell is no inspection record on file. In Las Vegas that can mean the addition has to be brought to code or torn out before a sale closes.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
Typical installed ranges for Las Vegas:
- Home Addition: $45,000 – $130,000, depending on square footage, foundation, and whether the tie-in is a simple wall or a full roof junction.
- ADU Construction (attached or detached): $90,000 – $220,000, driven by utility runs, kitchenette and bath scope, and site work.
- Garage Conversion: $30,000 – $80,000, the fastest path to a permitted ADU in most Las Vegas neighborhoods.
What moves the number: foundation type, span, electrical and plumbing runs, and finishes. Every scope, allowance, and price change arrives as a written change order before work happens – no surprise invoice at the end. Permits pulled and inspections signed on every eligible job, and the written 90-Day Done Right Promise backs the work.
DIY or Call Us?
You can safely read the panel tag, measure the span, and check whether an inspection record exists on your addition. That’s it. Structural connectors, hold-downs, truss seating, and the roof tie-in to the existing house are where DIY goes wrong – a bracket that looks fine can fail a load test, and the consequence is your roof, not a leaky faucet. A licensed framer with up to 28 years of experience knows what an inspector will look for before the framing cover goes up. If you’re already mid-project with a shell and a vanished contractor, call (866) 814-4155 for a free estimate and a written scope.
FAQs
Forty to sixty years with a proper foundation, correct connectors, and a sealed roof tie-in; the finish trim and sealants need attention every 8 – 12 years in our heat. The structure lasts if the footings and flashing were done right the first time.
Often yes. Underbuilt connectors, poor tie-in flashing, and unseated trusses can be corrected and re-inspected without a full teardown; a failed foundation or an unpermitted shell that won’t pass inspection usually means bringing it to code or replacing it. Call (866) 814-4155 and we’ll tell you which one you’re looking at.
Six to twelve months for a full ADU once permits are in hand, depending on size and whether it’s attached or detached. Garage conversions run faster, usually three to five months.
We spec to your plan set and the Delta series code on your panel tag, then order OEM or listed-equivalent structural components with the inspection paperwork attached. We don’t carry a stock of Delta parts on a truck – every component is ordered to your specific build. Call (866) 814-4155 to schedule a free estimate.
Written by the team at Barrett & Sons Construction Las Vegas, serving Las Vegas and nearby areas.