Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
KraftMaid Home Additions & ADU in Las Vegas, NV
KraftMaid Home Additions & ADU: The Las Vegas Owner’s Guide
We build KraftMaid-compatible home additions and ADUs in Las Vegas for roughly $45,000 – $130,000 for an addition and $90,000 – $220,000 for a full ADU, and the honest answer on timing is that these are permitted, inspected builds measured in months, not days. If you’re wondering why this page talks about “parts,” it’s because KraftMaid cabinetry is what most of our Las Vegas addition clients specify for the kitchenette, wet bar, laundry, or casita kitchen – and that’s where things show up wrong. Owners usually find out when a cabinet door sags into the drywall, a drawer box binds against its slide, or the addition’s kitchenette was drawn to KraftMaid’s standard 12-inch depth and the tile wall stopped at 11.
Which KraftMaid Models This Applies To
KraftMaid boxes carry the series on a label inside the sink base or on the back of a drawer box – look for Vantage (their entry line), Appeal, or the premium full-ply boxes. Door styles matter more than most people expect: a 1990s framed door and a current full-overlay door aren’t the same hinge platform, and the bore pattern on the box face is where the mismatch bites. Measure the box height and width to the nearest 1/16 inch, photograph the label, and photograph the hinge plate. That’s the whole trick to matching a KraftMaid part the first time.
On the OEM versus aftermarket question, we’re builders, not a parts counter, and we don’t claim to stock shelf inventory – so we’ll tell you plainly: for exposed hardware and door fronts, stay with genuine KraftMaid. For a Blum-style undermount slide or a soft-close hinge in a laundry cabinet inside an addition, a quality equivalent does the job and costs less. The difference in Las Vegas tends to show up in heat tolerance, not cosmetics. Aftermarket slides rated for a 100-pound drawer in a 105°F unshaded garage casita can start binding within 18 months; the OEM spec doesn’t. We’re an independent Las Vegas builder and not affiliated with KraftMaid – we install compatible product and we’ve seen how it behaves here.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your KraftMaid Home Additions & ADU Is Failing
We want to be clear that “the part” in this section means the KraftMaid casework and hardware inside your addition or ADU, plus the construction details around it. That’s where Las Vegas failure shows up first.
- Doors that won’t stay closed in summer. Usually a hinge plate that loosened after a winter of seasonal wood movement, not a bad hinge. Re-tightening the plate without addressing the bore hole makes it worse.
- Drawers that bind in the ADU kitchenette. Low-clearance slides plus a 100°F-plus garage footprint cause the grease and rollers to stiffen. We see this most in detached units where the mini-split setpoint climbed during a vacancy.
- Moisture-swollen boxes under the laundry sink. KraftMaid boxes hold up, but a Las Vegas remodel that skipped a leak pan or vapor barrier will take out the bottom panel before the door fronts ever fail.
- Toe-kick swelling and a soft floor at the addition threshold. That’s not cabinetry at all – it’s a slab or stem wall detail. If the box rocks when you lean on the counter, stop looking at the cabinet.
- Tile-to-cabinet gaps at the backsplash line. The addition was built to a nominal wall, the cabinet was set with a reveal, and the gap is bigger than a normal bead of caulk covers. Cosmetic on the surface, a waterproofing problem underneath.
Replacement Cost & What’s Included
Here’s the straight pricing for KraftMaid-compatible work in Las Vegas, so you can put your job against a line item instead of a phone quote:
| Scope | Typical installed range |
|---|---|
| Home addition (KraftMaid casework, permits, inspection) | $45,000 – $130,000 |
| ADU construction (full unit) | $90,000 – $220,000 |
| Garage conversion (ADU or livable) | $30,000 – $80,000 |
| KraftMaid cabinet installation within the new space | $4,000 – $13,000 |
| Kitchen island installation | $3,000 – $10,000 |
| Countertop installation (Cambria, Silestone) | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
What drives the range: square footage, whether a detached ADU needs its own utility trench, how much KraftMaid face-frame detail you choose versus a flat-panel front, and Las Vegas permitting complexity. Every scope, every allowance, every price change comes to you as a written change order before work happens – an allowance that isn’t on paper is a surprise waiting for a date. Every eligible job gets permits pulled and inspections signed, and every completed job is backed by our written 90-Day Done Right Promise.
See the difference
Before
After
Before
After
Before
AfterDIY or Call Us?
An honest split. What you can safely check yourself: tighten the hinge screws and note whether the plate holds; photograph the KraftMaid label; measure the box; confirm the drawer runs smooth with the cabinet empty. That’s it.
Where DIY goes wrong: drilling a new hinge bore in a KraftMaid door front is a one-shot cut – the panel is thin, and a slip means a $200 door we can’t talk our way out of matching. Cutting an addition opening to refit a cabinet run means cutting into framing and mechanicals, and that’s where a homeowner gets hurt or fails inspection. Electrical, gas, and any wall opening in a permitted addition belong with people who pull the permit.
If the problem is a sagging door, a binding drawer, or a kitchenette that was never built to spec, call (866) 814-4155. We’ll tell you whether it’s a five-minute fix or a real scope change – we’re not interested in turning a hinge screw into a remodel.
FAQs
How long does KraftMaid cabinetry last in a Las Vegas addition? Fifteen to twenty-five years is realistic for the casework itself if moisture is managed and doors are re-tightened once. Hardware is the shorter clock: slides and hinges in an unshaded or garage-adjacent space often need attention around the 10-15 year mark because of the heat swing.
Can a failing KraftMaid part be repaired instead of replaced? Often, yes. A loose hinge usually needs the screw plate reset, not a new door, and a binding drawer is frequently a slider adjustment rather than a swap. We look at repair first – it’s the cheaper answer and we’d rather earn the call than the change order. Call (866) 814-4155 to have us look.
How long does a swap or replacement take? A single door, drawer front, or slider is often a same-visit job for a crew member. A cabinet run, island, or any work that reopens a permitted wall or moves gas and electrical is measured in scheduled days, not in one trip – that’s not us padding a schedule, that’s how inspection works in Las Vegas.
How do you source the part? We identify the KraftMaid series and door style from the box label and measurements, then match OEM where it matters (face details, exposed hardware, matching fronts) and a quality equivalent where it doesn’t (undermount slides, hinges in hidden locations). We order against your confirmed spec – we don’t carry parts on a truck, and we won’t tell you we do.
Will the price change once work starts? No hidden invoices. Every scope change arrives as a written change order before a nail moves. Our estimates are free, and a second opinion on any written estimate you already have is free too. We also offer $40 Off Any Repair Over $200 and a permanent 10% Senior & Veteran discount.
Building a KraftMaid Space in Las Vegas – What We Bring
Barrett & Sons Construction is the owner-operated, name-on-the-truck alternative to national outfits that quote one price and show up with another. Our crew members have up to 28 years of experience, and we install KraftMaid in kitchens alongside Cambria and Silestone counters, Kohler fixtures, and the rest of the premium brands we build with across every trade. We’re an independent Las Vegas builder – not affiliated with KraftMaid – which is exactly why we can be honest about where OEM matters and where it doesn’t.
If you’re planning an addition or ADU in Las Vegas and want KraftMaid casework done right the first time, or you’ve got one already and something’s failing, call our free estimate line at (866) 814-4155. We’ll put the scope, the allowances, and the price in writing before anything starts, and stand behind it in writing for 90 days afterward.
Written by the team at Barrett & Sons Construction Las Vegas, serving Las Vegas and nearby areas.